Skip to content
VUBuddy

CS615 Final Term Current Subjective by Maha Malik

Software Project Management PDF 1.2 MBUpdated 23 Oct 2026
Final term past paper CS615 Final Term Current Subjective by Maha Malik PDF 1.2 MB
vubuddy.com
Type
Final term past paper
Course
CS615 Software Project Management
Size
PDF 1.2 MB
Updated
23 Oct 2026
Free download 0 of 3 used today
Download free · 1.2 MB

You get 3 free files a day on the website. Add the Chrome extension for 30 a day.

Unlimited downloads in the Android app Get it free on Google Play

Preview text

Text from pages 1, 2, 3 of 15. Download the file for all 15 pages.

1. Software Engineering Layers (Long Question)

Software engineering is a layered technology, composed of the following layers:

2. WBS: Work, Benefits, and Related Concepts

Benefits of WBS:

Defines 100% of the work per scope. Helps manage cost, schedule, and responsibilities. Tracks progress and aids in communication with stakeholders. Serves as a budgeting and reporting tool. Allows for task delegation and control over time

Characteristics of High-Quality WBS:

Hierarchical and logical structure. Must receive team buy-in. Deliverable-oriented and clear. Should be in sync with scope and project plan. Updated regularly to reflect current status.

WBS Conceptual:

A functional decomposition of the entire project. Bridges between project scope and schedule. Includes all deliverables, internal/external/interim. Produced after the scope statement but before detailed scheduling.

🔹 3. Four Cornerstones of Management · 1. Delegation · 2. Authority · 3. Responsibility · 4. Supervision

These ensure a structured and accountable project organization.

🔹 4. Review Techniques

1. Inspections

o Formal, structured reviews. o Roles: moderator, author, reader, recorder, inspector.

2. Walkthroughs

o Informal, developer-led reviews. o Less rigorous but encourage discussion.

3. Formal Technical Reviews (FTR)

o Reviews logic, consistency, standards adherence. o End with summary reports and defect lists.

🔹 5. COCOMO Model: Intermediate Form

Intermediate COCOMO uses:

🔹 6. Initial Process: Inputs, Outputs, Tasks

Initiation Phase Includes:

Input: Business case, project charter. Output: Project approval, stakeholder identification. Tasks: Define goals, select team, assess feasibility, identify risks.

🔹 7. Activities of SQA for Quality Control

Software Reviews: Identify defects early (inspection, walkthrough, FTR). Quality Metrics: Estimate cost, monitor productivity. SQA Audits: Ensure adherence to process and documentation. Configuration Management (SCM): Track changes, maintain integrity. Reporting & Records: Maintain logs for future audits and improvements.

✅ 1. Initial Estimates – Formula + Example · Formula for Initial Estimation (Effort): · Effort = a₁ × (SLOC/1000)^a₂ × EAF

All CS615 files →
CS615 Software Project Management All CS615 handouts, past papers, quizzes and MCQs in one place. Open course page

Get more out of VUBuddy, for free

Android app Free on Google Play
  • Unlimited downloads
  • The explanation behind every MCQ answer
  • Study offline on slow data
Get the Android app
Chrome extension Free on the Chrome Web Store
  • 30 downloads a day instead of 3
  • Sign in and buy Pro Semester here
Add to Chrome

One Pro Semester membership works in both the extension and the app.