LECTURE NO: 1
Objective:
In this lecture we will discuss “software crisis” in detail with reason behind this crisis. It will be followed by discussion on the classic model with reference to water fall model and V model, what are the drawbacks in this model and then need for an Agile process model
History of software crisis:
Software crisis was a term used in the early days of computing science. The term was used to describe the impact of rapid increases in computer power and the complexity of the problems which could be tackled. In essence, it refers to the difficulty of writing correct, understandable, and verifiable computer programs. The term "software crisis" was coined by F. L. Bauer at the first NATO Software Engineering Conference in 1968 at Garmisch, Germany
Software CHAOS Report Standish Group Study
In 1986, Alfred Spector, president of Transarc Corporation, co-authored a paper comparing bridge building to software development. The premise: Bridges are normally built on-time, on budget, and do not fall down. On the other hand, software never comes in on-time or on-budget. In addition, it always breaks down. (Nevertheless, bridge building did not always have such a stellar record. Many bridge building projects overshot their estimates, time frames, and some even fell down.). One of the biggest reasons bridges come in on-time, on-budget and do not fall down is because of the extreme detail of design. The design is frozen and the contractor has little flexibility in changing the specifications. However, in today's fast moving business environment, a frozen design does not accommodate changes in the business practices. Therefore a more flexible model must be used. This could be and has been used as a rationale for development failure. But there is another difference between software failures and bridge failures, beside 3,000 years of experience. When a bridge falls down, it is investigated and a report is written on the cause of the failure. This is not so in the computer industry where failures are covered up, ignored, and/or rationalized. As a result, we keep making the same mistakes over and over again.
FAILURE RECORD
In the United States, we spend more than $250 billion each year on IT application development of approximately 175,000 projects. The average cost of a development project for a large company is $2,322,000; for a medium company, it is $1,331,000; and for a small company, it is $434,000. A great many of these projects will fail. Software development projects are in chaos, and we can no longer imitate the three monkeys -- hear no failures, see no failures, speak no failures. The Standish Group research shows a staggering 31.1% of projects will be cancelled before they ever get completed. Further results indicate 52.7% of projects will cost 189% of their original estimates. The cost of these failures and overruns are just the tip of the proverbial iceberg. The lost opportunity costs are not measurable, but could easily be in the trillions of dollars. One just has to look to the City of Denver to realize the extent of this problem. The failure to produce reliable software to handle baggage at the new Denver airport is costing the city $1.1 million per day. Based on this research, The Standish Group estimates that in 1995 American companies and government agencies will spend $81 billion for cancelled software projects. These same organizations will pay an additional $59 billion for software projects that will be completed, but will exceed their original time estimates. Risk is always a factor when pushing the technology envelope, but many of these projects were as ordinary as a drivers license database, a new accounting package, or an order entry system. On the success side, the average is only 16.2% for software projects that are completed on time and on-budget. In the larger companies, the news is even worse: only 9% of their projects come in on-time and on-budget. And, even when these projects are completed, many are no more than a mere shadow of their original specification requirements. Projects completed by the largest American companies have only approximately 42% of the originally-proposed features and functions. Smaller companies do much better. A total of 78.4% of their software projects will get deployed with at least 74.2% of their original features and functions. This data may seem disheartening, and in fact, 48% of the IT executives in our research sample feel that there are more failures currently than just five years ago. The good news is that over 50% feel there are fewer or the same number of failures today than there were five and ten years ago.
Reasons for Failure:
i. Unclear, unstable, misunderstood and missing requirements ii. To late integration of results of working and components, thus to late recognition of risks and errors iii. Fast changing technologies iv. Missing Quality Management v. Overvaluation of documents vi. No model-based process
Examples of Software Failures:
First Known Software Bug:
Buggy Computer Club, in 1945 engineers found a moth in Panel F, Relay #70 of the Harvard Mark II system. The computer was running a test of its multiplier and adder when the engineers noticed something was wrong. The moth was trapped, removed and taped into the computer's logbook with the words: "first actual case of a software bug being found."
i. NASA: Mariner Failure in 1962
A bug in the flight software for the Mariner 1 causes the rocket to divert from its intended path on launch. Mission control destroys the rocket over the Atlantic Ocean. The investigation into the accident discovers that a formula written on paper in pencil was improperly transcribed into computer code, causing the computer to miscalculate the rocket's trajectory.
ii. Korean Airliner Crash
The Korean Airlines KAL 801 accident in Guam killed 225 out of 254 aboard. A software design problem was discovered in barometric altimetry in Ground Proximity Warning System (GPWS)
Related CS711 files
All CS711 files →Get more out of VUBuddy, for free
- Unlimited downloads
- The explanation behind every MCQ answer
- Study offline on slow data
- 30 downloads a day instead of 3
- Sign in and buy Pro Semester here
One Pro Semester membership works in both the extension and the app.