Skip to content
VUBuddy

MGT402 Quiz 2 by HB

Cost & Management Accounting PDF 2.4 MBUpdated 23 Oct 2026
Quiz MGT402 Quiz 2 by HB PDF 2.4 MB
vubuddy.com
Type
Quiz
Course
MGT402 Cost & Management Accounting
Size
PDF 2.4 MB
Updated
23 Oct 2026
Free download 0 of 3 used today
Download free · 2.4 MB

You get 3 free files a day on the website. Add the Chrome extension for 30 a day.

Unlimited downloads in the Android app Get it free on Google Play

Preview text

Text from pages 3, 4, 5 of 11. Download the file for all 11 pages.

Q1. Gross Pay - Statutory deductions - Non-statutory deduction = ?

  1. Commission earned
  2. Net Pay
  3. Income Tax
  4. Basic Pay

Q2. Which of the following is CORRECT to compute Capacity Variance?

  1. Applied factory overhead (FOH) cost ÷ Estimated FOH cost
  2. Applied factory overhead (FOH) cost + Estimated FOH cost
  3. Applied factory overhead (FOH) cost x Estimated FOH cost
  4. Applied factory overhead (FOH) cost - Estimated

FOH cost

Q3. Factory overhead absorption rate = ?

  1. Fixed overhead rate + variable overhead rate
  2. Fixed overhead rate ÷ variable overhead rate
  3. Fixed overhead rate - variable overhead rate
  4. Fixed overhead rate x variable overhead rate

Q4. The time worked over and above the employee's basic working week is called as:

  1. Overtime
  2. Commission
  3. Flex time
  4. Shift allowance
  5. Suppose that a worker is paid Rs. 100 per hour and he has spent 200 hours to manufacture 250 pieces during a particular month. Keeping in view the time-based wage system, total wages of worker would be:
  1. Rs. 25000
  2. Rs. 20,000
  3. Rs. 50,000
  4. None of the given options

6. Wage rate per hour= Rs. 62.50

Halsey Premium Plan.

a. None of the given options · b. Rs. 875 · c. Rs. 125 · d. Rs. 750

Q7. Which of the following formula is used to compute gross wages under Halsey Premium Plan?

  1. Gross Wages = (Time worked x wage rate) + ½

(Time saved x wage rate)

b. Gross Wages = (Time saved x wage rate) + ½ (Time saved x wage rate)

c. Gross Wages = (Time worked x wage rate) - ½ (Time saved x wage rate)

d. Gross Wages = (Time saved x wage rate) + ½ (Time saved x wage rate)

  1. Budgeted variable overhead: Rs 90,000; Budgeted activity level: 30,000 direct labor hours; Fixed factory overhead cost: Rs. 60,000; Actual activity level: 35,000 direct labor hours; Actual variable FOH cost: Rs. 120,000.

Variable overhead rate: ?

  1. Rs. 3 per direct labor hour
  2. None of the given options
  3. Rs. 5 per direct labor hour
  4. Rs. 2 per direct labor hour

Q9. Which of the given equation is CORRECT?

  1. Take home pay = Gross pay - Income tax + Subscriptions to a trade union - Contributions by the employee to a pension scheme.
  2. Take home pay = Gross pay - Income tax - Subscriptions to a trade union + Contributions by the employee to a pension scheme.
  3. Take home pay = Gross pay + Income tax - Subscriptions to a trade union - Contributions by the employee to a pension scheme.
  4. Take home pay = Gross pay - Income tax - Subscriptions to a trade union - Contributions by

the employee to a pension scheme.

10.

All MGT402 files →
MGT402 Cost & Management Accounting All MGT402 handouts, past papers, quizzes and MCQs in one place. Open course page

Get more out of VUBuddy, for free

Android app Free on Google Play
  • Unlimited downloads
  • The explanation behind every MCQ answer
  • Study offline on slow data
Get the Android app
Chrome extension Free on the Chrome Web Store
  • 30 downloads a day instead of 3
  • Sign in and buy Pro Semester here
Add to Chrome

One Pro Semester membership works in both the extension and the app.