Skip to content
VUBuddy

CS507 Final Term Solved MCQs Set 2 by Junaid

Information Systems PDF 654 KBUpdated 23 Oct 2026
Final term past paper CS507 Final Term Solved MCQs Set 2 by Junaid PDF 654 KB
vubuddy.com
Type
Final term past paper
Course
CS507 Information Systems
Size
PDF 654 KB
Updated
23 Oct 2026
Free download 0 of 3 used today
Download free · 654 KB

You get 3 free files a day on the website. Add the Chrome extension for 30 a day.

Unlimited downloads in the Android app Get it free on Google Play

Preview text

Text from pages 2, 3, 4 of 17. Download the file for all 17 pages.

Q1. Which of the following is a methodology used to create a plan for how an organization will resume partially or completely interrupted critical functions within a predetermined time after a disaster or disruption?

 Business continuity Plan

PG # 169

  •  Audit Logs
  •  Disaster Plan
  •  Audit Trials
  1. If a flow chart becomes complex, it is better to use symbol to reduce to number of flow lines.
  •  Start

 Connector

PG # 108

  •  End
  •  Process
  1. The flowchart helps in locating and correcting errors which is also known as

 o debugging

PG # 115

  •  designing

Q4. Which of the following is not used for biometric attendance?

  •  Finger Print
  •  Hand Print
  •  Voice Print

 Personal Pen

PG # 157

Q5. Who is responsible for providing independent assurance to management on the appropriateness of the security objectives?

 Information System Auditor

PG # 147

  •  Process Owners
  •  Account Officer
  •  Management Trainee

Q6. Which of the following organizational structures contains less number of management levels?

 Flat Structure

PG # 21

  •  Tall Structure
  •  Classical Structure
  •  Very Tall Structure
  1. Information is the processed form of being verified and substantiated from various sources.  Business  Data

PG # 28

 Transaction  Sequence 8. is the process of assuring that the specific tasks are being carried out efficiently and effectively.  Cracking

 Hacking

 Operational Planning

PG # 32

 Information leakage

Q9. In risk management process for an IT system, which of the following is the first step?

 System Characterization

PG # 162

 Threat identification  Control Analysis

 Impact Analysis

Q10. In which phase of risk management process, project manager will assess the level of risk to the IT system?

 Risk Determination

PG # 167

 Impact Analysis

 Broad Determination  Likelihood Analysis

  1. In Object oriented programming, Polymorphism means  information hiding  having single shape

 having multiple shapes

PG # 133

 message-passing

  1. Identify the type of active attacks from the following, which allow user to employ the facilities of the operating system without being subject to the normal controls.  Masquerading

 Backdoors/trapdoors

PG # 175

 Spoofing  Trojan horse 13. is the process of quickly putting together a working model in order to test various aspects of the design to gather early user feedback.  Testing

 Prototyping

PG # 99

 Debugging

Q14. Which aspect of web trust principle maintains effective controls and practices to ensure that private customer information is protected from uses not related to entity business?

 Information protection

PG # 180

 Transaction integrity  Information overload

 Firewall disclosures

  1. A measures the results of

 Key Performance Indicator (KPI), Critical Success Factor (CSF) PG #

 Critical Success Factor (CSF), Key Performance Indicator (KPI)  Critical Success Factor (CSF), organization’s internal strength only  Key Performance Indicator (KPI), organization’s competitors only

  1. Creating a map with directions from your home to the post office on Google maps is.  E-commerce  M-commerce

 E-business

PG # 183

 G-commerce

Q17. Individuals used to sell items by advertising in the online classified section of a website. Identify the type of e- commerce model followed in this case?

 Business to Government (B2G)  Business to Business (B2B)  Government to Business (G2B)

 Consumer to Consumer (C2C)

PG # 185

Q18. Which segment of supply chain management includes distributing, delivering to customer and final consumption of the product?

 Upstream supply chain segment  External supply chain segment

 Downstream supply chain segment

PG # 193

 Integrated supply segment 19. is an industry term for the broad set of activities supported by multi-module application software that helps a manufacturer or other business to

All CS507 files →
CS507 Information Systems All CS507 handouts, past papers, quizzes and MCQs in one place. Open course page

Get more out of VUBuddy, for free

Android app Free on Google Play
  • Unlimited downloads
  • The explanation behind every MCQ answer
  • Study offline on slow data
Get the Android app
Chrome extension Free on the Chrome Web Store
  • 30 downloads a day instead of 3
  • Sign in and buy Pro Semester here
Add to Chrome

One Pro Semester membership works in both the extension and the app.