Feb 06, 2021 (6:00PM)
Status: Open
- if:
Answer: DRE = E / (E+D) 2. __________ a statistical technique is used to develop an overall indication of improvement in software quality.
Answer: Error Index 3. The two objectives of a _________ are to identify problem areas within the work product and a checklist of action items.
Answer: Formal Technical Reviews 4.
Answer: Pareto Principle 5. Work products used to track errors is/are __________ during software development.
Answer: Requirements specification, design document and source code 6. BCWP refers to:
Answer: Budgeted cost of work performed so far 7.
Answer: The defined target which you need to achieve 8. Earned Value Analysis (EVA) is a ______ technique for assessing the progress of a project.
Answer: Quantitative 9. FTR is a quality control activity performed by software engineers, it stands for:
Answer: Formal Technical Review 10. BCWS is a term used in Earned Value Analysis it stands for_______.
Answer: Budgeted Cost of Work Schedule
Q1. ______ is defined as the probability of failure free operation of a computer program in a specified environment for a specified time.
Correct answer: Software Reliability
Q2. Schedule Performance Index SPI) is equal to
Correct answer: BCWP / BCWS
Q3. The two objectives of a _____ are to identify problem areas within the work product and a checklist of action items.
Correct answer: Review Issue List
Q4. It is noted that a/an ___________ review can be worse then no review at all
Correct answer: Uncontrolled
Q5. The Review participants SHOULD NOT be focused on _______.
Correct answer: Weaknesses of the developer
Q6. The progress on a project at any given point in time can be calculated by:
Correct answer: Adding all the BCWS till that point for all tasks
Q7.
Correct answer: The defined target which you need to achieve
Q8. If an error related to requirements is identified in testing phase, error will be considered an error of ________ phase.
Correct answer: Requirement
Q9. ________ involves rework, repair, and failure mode analysis of the product.
Correct answer: Internal Failure Cost
Related CS605 files
All CS605 files →- CS605 Midterm Solved MCQs by Junaid Midterm PDF 1.1 MB
- CS605 Midterm Solved MCQs with References by Arslan Midterm PDF 568 KB
- CS605 Midterm File 4 Midterm PDF 4.2 MB
- CS605 Midterm File 5 Midterm PDF 4.5 MB
- CS605 Final Term Highlighted Handouts Set 2 by Masters Highlighted PDF 1.9 MB
- CS605 Final Term Solved File 6 by Team Hadi Final term PDF 5 MB
Get more out of VUBuddy, for free
- Unlimited downloads
- The explanation behind every MCQ answer
- Study offline on slow data
- 30 downloads a day instead of 3
- Sign in and buy Pro Semester here
One Pro Semester membership works in both the extension and the app.