Skip to content
VUBuddy

CS615 Midterm MCQs by VU Topper RM

Software Project Management PDF 729 KBUpdated 23 Oct 2026
Midterm past paper CS615 Midterm MCQs by VU Topper RM PDF 729 KB
vubuddy.com
Type
Midterm past paper
Course
CS615 Software Project Management
Size
PDF 729 KB
Updated
23 Oct 2026
Free download 0 of 3 used today
Download free · 729 KB

You get 3 free files a day on the website. Add the Chrome extension for 30 a day.

Unlimited downloads in the Android app Get it free on Google Play

Preview text

Text from pages 2, 3, 4 of 32. Download the file for all 32 pages.

Q1. Vu-Topper RM (1 marks)

In management, “making arrangements” is description of ___. A. Cost B. Time C. Quality

D. Organizing Page 1

Q2. Vu-Topper RM (1 marks)

A ‘facilitator’ controls the meeting can be __________

A. All Page 100

B. Outsider C. Customer D. Developer

Q3. Vu-Topper RM (1 marks)

The overall role of Software in a larger system is identified during A. Process engineering

B. System engineering Page 92

C. Requirements Elicitation D. Requirements engineering

Q4. Vu-Topper RM (1 marks)

__________contains an analysis of what went wrong, what went right, and what you could have done better in the software project. A. Identify learning B. Create reference material

C. Prepare closedown report Page 81

D. Identify reusable software components

Q5. Vu-Topper RM (1 marks)

_____________ is a software engineering task that bridges the gap between system level requirements engineering and software design A. Software Requirements B. Requirements Gathering

C. Requirements Analysis Page 93

D. Requirements Engineering

Q6. Vu-Topper RM (1 marks)

Research-oriented software development is a A. People-related problems B. Process-related problems

C. Product-related problems Page 87

D. Technology-related problems

Q7. Vu-Topper RM (1 marks)

Unproductive work environment is a A. Process-related problems B. Product-related problems

C. People-related problems Page 85

D. Technology-related problems

Q8. Vu-Topper RM (1 marks)

Mode of specification has a great impact on ________ of solution.

A. Quality Page 103

B. Importance C. Satisfaction D. Completeness

Q9. Vu-Topper RM (1 marks)

In management, “deciding what is to be done” is description of ____. A. Cost B. Time C. Quality

D. Planning Page 1

Q10. Vu-Topper RM (1 marks)

Software requirements engineering is a process of all except:

A. Design Page 92

B. Discovery C. Refinement D. Specification

Q11. Vu-Topper RM (1 marks)

The quality of software is said to be high if it meets the: A. Design, defined for the product B. Standards, defined for the product C. Procedures, defined for the product

D. Standards and Procedures, defined for the product Page 118

Q12. Vu-Topper RM (1 marks)

The check-in and checkout facilities provide ________. A. SCI control B. Best control C. Component control

D. Synchronization control Page 114

Q13. Vu-Topper RM (1 marks)

These all are Product Operation Factors except: A. Usability B. Efficiency C. Reliability

D. Testability Page 120

Q14. Vu-Topper RM (1 marks)

Ineffective project sponsorship by management is a : A. Product-related problems B. Process-related problems

C. People related problems Page 86

D. Technology-related problems

All CS615 files →
CS615 Software Project Management All CS615 handouts, past papers, quizzes and MCQs in one place. Open course page

Get more out of VUBuddy, for free

Android app Free on Google Play
  • Unlimited downloads
  • The explanation behind every MCQ answer
  • Study offline on slow data
Get the Android app
Chrome extension Free on the Chrome Web Store
  • 30 downloads a day instead of 3
  • Sign in and buy Pro Semester here
Add to Chrome

One Pro Semester membership works in both the extension and the app.