CS615 Quiz 3 by VU Topper RM

Software Project Management PDF 227 KBUpdated 23 Oct 2026
Quiz CS615 Quiz 3 by VU Topper RM PDF 227 KB
vubuddy.com
Type
Quiz
Course
CS615 Software Project Management
Size
PDF 227 KB
Updated
23 Oct 2026
Free download 0 of 3 used today
Download free · 227 KB

You get 3 free files a day on the website. Add the Chrome extension for 30 a day.

Unlimited downloads in the Android app Get it free on Google Play

Preview text

Text from pages 1, 2, 3 of 6. Download the file for all 6 pages.

CS615 Important Mcqs File For Final Term · Solve By Vu_Toper With RM · 85% Paper Ay Ga

A ___________ contract is a commitment by the developer to provide an agreed product or service for an agreed fee, within an agreed schedule.

Fixed price Page 158

________________is anything that reduces the probability of potential consequences of project risk events.

Preventive action Page 155

There cannot be a sudden crossover from one phase to the next in __________.

Waterfall model Page 164

We use _____________ when there is a conflict in client requirements.

Prototyping model Page 165

Prototyping Model Page 67

A ________________ model is flexible and does not follow any rigid rules of implementation.

Process Page 161

____________ technique used to integrate the project’s scope, schedule, and resources and to measure and report project performance from initiation to closeout

Earned value management (EVM) Page 154

_____________ is the process of progressively elaborating and documenting the project work that produces the product of the project.

Scope Planning Page 157

________________ is anything done to bring expected future project performance in line with the project plan.

Corrective action Page 155

____________ is another important factor that can affect the accuracy and efficacy of estimates.

Project size Page 224

Use functional structures when the organization is __________ .

Small Page 54

The ____________________ does not support the development of a working model.

Waterfall model Page 164

If the size of a project is extensive and the client prefers all the features of the proposed project at the first delivery, you can select the -------model.

Waterfall Page 163

2. 3. Formal Documentation

4. Preparation Instruction

  1. Associated Documentation
  2. Effective Resolution (I selected 1st one)

3.

  1. _____________ is the process of progressively elaborating and documenting the project work that produces the product of the project.
  2. The _______ of scope planning are the scope statement and scope management plan, with the supporting detail.

Outputs

6. All of the following are descriptions of how new system is to be developed in Technical Approach EXCEPT _______ .

7. It is the responsibility of ___________ to select the structure best suited for the project.

Project Manager

8. Estimation of following Critical factors are essential EXCEPT ________ .

Money

  1. The ___________ is a model that works on an iterative cycle of gathering customer requirements.
  2. Describe where the work must be performed. Specify the location of hardware and software and where the people must perform the work is called
  3. Scope of work

12. Location of Work

  1. Period of Performance
  2. Deliverable Schedule

It is the responsibility of __________to select the structure of best suited for the project.

Project management

2. He DiDs (Data item Description) includes a selection is called. Preparation instruction

3. A___ contract is a commitment by the developer to provide an agreed product or service for an agreed fee, within an agreed

schedule. Food price

4. To expend or contract product scope to modify cost or schedule estimators are example of ___.

Change requests

5. ____ is the process of progressively elaborating and documenting the project work that produces the product of the project.

6. SDP stand for

7. Computer software deteriorates due to change is often referred to as ___

Software reengineering

8. Use functional structure when the organization is____

Small

9. CPM stand for

Critical path method

  1. Staffing management plan can be

All of the above

All CS615 files →
CS615 Software Project Management All CS615 handouts, past papers, quizzes and MCQs in one place. Open course page

Get more out of VUBuddy, for free

Android app Free on Google Play
  • Unlimited downloads
  • The explanation behind every MCQ answer
  • Study offline on slow data
Get the Android app
Chrome extension Free on the Chrome Web Store
  • 30 downloads a day instead of 3
  • Sign in and buy Pro Semester here
Add to Chrome

One Pro Semester membership works in both the extension and the app.