Skip to content
VUBuddy

CS605 Final Term Quiz 3 12 July 2023 by Miss Mehwish

Software EngineeringII PDF 542 KBUpdated 23 Oct 2026
Quiz CS605 Final Term Quiz 3 12 July 2023 by Miss Mehwish PDF 542 KB
vubuddy.com
Type
Quiz
Course
CS605 Software EngineeringII
Size
PDF 542 KB
Updated
23 Oct 2026
Free download 0 of 3 used today
Download free · 542 KB

You get 3 free files a day on the website. Add the Chrome extension for 30 a day.

Unlimited downloads in the Android app Get it free on Google Play

Preview text

Text from pages 1, 2, 3 of 4. Download the file for all 4 pages.

We also provide Past papers for Mids. and Finals

Cross Check your answers before submitting directly from the file. We are not responsible for 100% correction as human error exists

Q1. Work products used to track errors is/are __________ during software development. Options:

  1. Requirement specification
  2. Requirements specification, design document, and source code
  3. Source code
  4. Design document

Correct option: a) Requirement specification

Q2. The two objectives of a _________ review are to identify problem areas within the work product and provide a checklist of action items.

  1. Testing
  2. Informal Technical Reviews
  3. Review Issue List
  4. Controlled

Correct option: b) Informal Technical Reviews

Q3. If an error related to requirements is identified in the testing phase, this error will be considered as an error of ___________ phase.

  1. Testing
  2. Code
  3. Design
  4. Requirements

Correct option: d) Requirements

Q4. It is noted that an __________ review can be worse than no review at all. Options:

  1. Controlled
  2. Uncontrolled
  3. Intermediate
  4. Normal

Correct option: b) Uncontrolled

Q5. Gathered data of Ereq, Edesign, and Ecode in the current project and comparison with historical data will help in ____________.

  1. Optimized resource allocation
  2. Bad resource allocation
  3. Unwelcome resource allocation
  4. Incorrect resource allocation

Correct option: a) Optimized resource allocation

Q6. Schedule Performance Index (SPI) is equal to _________.

  1. BCWP + BCWS
  2. BCWP - BCWS
  3. BCWP * BCWS
  4. BCWP / BCWS

Correct option: d) BCWP / BCWS

Q7. __________ a statistical technique is used to develop an overall indication of improvement in software quality.

  1. Quality Assurance
  2. Cost of Quality
  3. Error Index
  4. Pareto Principle

Correct option: d) Pareto Principle

Q8. In a review, the ___________ should be pointed out gently, and the tone should be loose and constructive.

  1. Conditions
  2. Inputs
  3. Errors
  4. Outputs

Correct option: c) Errors

  1. ___________ is one of the techniques used during severe deadline pressure. Options:
All CS605 files →
CS605 Software EngineeringII All CS605 handouts, past papers, quizzes and MCQs in one place. Open course page

Get more out of VUBuddy, for free

Android app Free on Google Play
  • Unlimited downloads
  • The explanation behind every MCQ answer
  • Study offline on slow data
Get the Android app
Chrome extension Free on the Chrome Web Store
  • 30 downloads a day instead of 3
  • Sign in and buy Pro Semester here
Add to Chrome

One Pro Semester membership works in both the extension and the app.