Skip to content
VUBuddy

CS605 Final Term Quiz 3 13 July 2023 by Miss Mehwish

Software EngineeringII PDF 542 KBUpdated 23 Oct 2026
Quiz CS605 Final Term Quiz 3 13 July 2023 by Miss Mehwish PDF 542 KB
vubuddy.com
Type
Quiz
Course
CS605 Software EngineeringII
Size
PDF 542 KB
Updated
23 Oct 2026
Free download 0 of 3 used today
Download free · 542 KB

You get 3 free files a day on the website. Add the Chrome extension for 30 a day.

Unlimited downloads in the Android app Get it free on Google Play

Preview text

Text from pages 1, 2, 3 of 4. Download the file for all 4 pages.

We also provide Past papers for Mids. and Finals

Cross Check your answers before submitting directly from the file. We are not responsible for 100% correction as human error exists

Q1. Instead of going through the entire design in a meeting, we narrow down the focus by conducting _________ for each component, or small group of components.

  • Testing
  • Walkthroughs
  • Informal Reviews

Correct option: Walkthroughs

Q2. The first task in concept development project is to:

  • Determine the scope of the concept
  • Determine the resources required for the concept
  • Determine the test cases for the concept
  • Determine the cost of the concept

Correct option: Determine the scope of the concept

  1. ___________ involves rework, repair, and failure mode analysis of the product. Options:
  • Appraisal Cost
  • External Failure Cost
  • Internal Failure Cost
  • Prevention Cost

Correct option: Internal Failure Cost

Q4. __________ is one of the techniques to prepare project schedule once we have defined "task network".

  • System resource negotiation method (SRNM)
  • Program evaluation and review techniques (PERT)
  • Strategic Schedule Development technique (SSDT)
  • Critical Communication path method (CCPM)

Correct option: Program evaluation and review techniques (PERT)

Q5. Following are effective guidelines for Review EXCEPT

  • Be sensitive to personal egos
  • We need to review the product not the producer
  • Errors should be pointed out gently
  • Be sensitive to personal preferences

Correct option: Be sensitive to personal preferences

  1. FTR is a quality control activity performed by software engineers, it stands for: Options:
  • Formatted Technical Review
  • Formal Technical Review
  • Fetched Technical Requirement
  • Feasibility of Technical Requirement

Correct option: Formal Technical Review

  1. Formula for the total number of Channels of communication involving N people is given by: Options:
  • C = N(N-1)
  • C = N(N-1)/2
  • C = N(N+1)*2
  • C = N(N+1)

Correct option: C = N(N-1)/2

  1. It is noted that a/an __________ review can be worse than no review at all. Options:
  • Normal
  • Controlled
  • NormalControlled

Correct option: Normal

  1. In order to use the PERT and CPM, which one of the followings is NOT required? Options:
  • Estimation of effort
  • Decomposition of tasks – also known as the work breakdown structure (WBS)
  • Teams communication mode details
  • Interdependencies
All CS605 files →
CS605 Software EngineeringII All CS605 handouts, past papers, quizzes and MCQs in one place. Open course page

Get more out of VUBuddy, for free

Android app Free on Google Play
  • Unlimited downloads
  • The explanation behind every MCQ answer
  • Study offline on slow data
Get the Android app
Chrome extension Free on the Chrome Web Store
  • 30 downloads a day instead of 3
  • Sign in and buy Pro Semester here
Add to Chrome

One Pro Semester membership works in both the extension and the app.