Configuration control tools include_________
A. All of given Page 116 ok
B. Change control tools C. Automatic version control D. Monitoring, auditing and registration support utilities
Auditing is activity of ________________ A. Testing B. Design
C. SCM
D. Construction
FAST is a requirements elicitation __________ A. Process
B. Technique ok
C. Model D. Design process
All of the followings are Technology-related problems except: A. Switching tools in mid way B. Insufficient identification C. Overestimated savings from reusable components and new tools and methods ok D. Integrating different software products in cross-platform
All of the following are benefits of meeting quality requirements A. Low turnover
B. Less rework
C. An increase in stakeholder satisfaction D. Higher productivity which one
Which of the following might require re-baselining of the cost baseline?
Correct answer: Revised cost estimates
Given all are foundational design concepts except__________ A. Abstraction B. Inheritance
C. Procedural
D. Information Hiding
Project Quality Management includes the --------------- required to ensure that the project will satisfy the needs for which it was undertaken A. Time B. Cost
C. Processes Page 39
D. Resources
Strong leadership motivation may sound an obvious trait for a -----------
A. Leader Page 46
B. Manager C. Specialist D. Team Lead
Which of the following project management knowledge area deal with quality?
Correct answer: Project Quality Management
Dividing software projects into Phases helps _________ in managing the complexities and uncertainties. Choose suitable answer.
A. The project manager
B. The stakeholder C. The security officer D. The Programmer
These all are process-related problems in a software project except
A. Abandoning quality under pressure of deadlines ok
B. Structured and hurried software development C. Insufficient identification D. Unsuitable life cycle model selection
_________is an integral part of project management. Cost management
Risk management Page 73
Financial management Software management
The project phases are known as the ____________ . Cost life cycle Quality life cycle
Project life cycle Page 13
Time period life cycle
In software project management, it is a very critical factor to
A. Timely arrange the man power ok
B. Timely arrangement of electric generator C. Timely arrangement of disinfection D. Timely arrangement of the stationary
Motivates group towards attainment of the goals. It is the responsibility of ____________. Choose most suitable option. A. Junior developer B. Assistant manager C. Junior designer
Related CS615 files
All CS615 files →Get more out of VUBuddy, for free
- Unlimited downloads
- The explanation behind every MCQ answer
- Study offline on slow data
- 30 downloads a day instead of 3
- Sign in and buy Pro Semester here
One Pro Semester membership works in both the extension and the app.