- Type
- Midterm past paper
- Course
- MTH601 Operations Research
- Size
- PDF 147 KB
- Updated
- 23 Oct 2026
You get 3 free files a day on the website. Add the Chrome extensionSign in with the extension for 30 a day.
Preview text
Text from pages 1, 2, 3 of 4. Download the file for all 4 pages.
MIDTERM EXAMINATION
FALL 2006 MTH601 - OPERATIONS RESEARCH Marks: 40 Time: 60min
Student Name:
Center Name/Code:
Exam Date:
- 2. Paste the bitmap image for the tables, diagrams etc while solving your questions
- This examination is closed book, closed notes, closed neighbors.
- Calculator is allowed
Question
Q1. A = 6 (10 marks)
B = 2
C = 13 D = 4
E = 9 F = 2
G = 10
H = 6 I = 7
J = 3 K = 4
L = 10
M = 5
Calculate the (i). EST, EFT, LST and LFT for each activity. (ii). Total Float, Free Float and Independent Float. (iii). Critical activities and Critical Path.
Q2. An Automobile factory manufacturers a particular type of gear within the factory. This gear is used in the final assembly. The particulars of this gear are: (15 marks)
Demand rate =14000 units/year Manufacturing rate =35000 units/year Set up cost =Rs 500 per set up Holding cost = Rs 15/units/year Determine: (a) The optimum manufacturing quantity. (b) The maximum inventory. (c) The time between orders. (d) The number of orders/year. (e) The time of manufacture. (f) The optimum annual cost if the cost of the item per unit is Rs. 25
Q3. Consider the following problem, Solve graphically (10 marks)
Minimize. Z = 3X1 + 2X2 Subject to 2X1 + X2 ≥ 10 -3X1 + 2X2 ≤ 6 X1 + X2 ≥ 6 X1 , X2 ≥ 0
Q4. Which one is best describe Sectoral planning (1 marks)
Inventory Planning in agriculture
Improving the layout of a workshop in a company
Simulation Modeling of the Economy of the country
Q5. _________________ is the most appropriate to situations where we maintain a relative stable employment levels and utilize the resource at a more constant rate (1 marks)
(a). Resource Leveling Program
(b). Resource Allocation Program
(c). Both a & b
(d). None of these.
Q6. If the slack time is zero, it means that the project will be (1 marks)
Delayed
Completed on schedule
Related MTH601 files
All MTH601 files →Get more out of VUBuddy, for free
- Unlimited downloads
- The explanation behind every MCQ answer
- Study offline on slow data
- 30 downloads a day instead of 3
- Sign in and buy Pro Semester here
One Pro Semester membership works in both the extension and the app.