- The first step in a problem solving exercises in OR is the ________that exist in the system. Construction of the model of problem
Identification o f the problem
Solution of the problem
- A requirement for the definition of the problem in OR is that _________must be clearly defined which helps to focus attention on what the problem is
Method
Objective
Solution
- In a network flow diagram, time follows from_________
Left to right
Right to left Any direction
- The dummy activities consume
No time,no resources
No time but some resources Some resources in minimum time All resources in a given time
- In a national highway system interestion of two or more roads has the same analogy as the ______in the network flow diagram.
Branch Critical activity Flow
Node
- Best possible time estimate that a given activity would take under normal conditions which often exist, is called
Most likely time estimate
Pessimistic time estimate Smallest time estimate Activity time estimate
- In ______, activity time estimates are distributed according to beta distribution
MTH601-Midterm (June 7, 2014)
PERT
CPM Project Network Float
- If we have 2,4 and 12 hours as the optimistic(t0) most likely (tm) and pessimistic(tp) then the expected time for the activity would be
- If t0=2 tm=5 and tp=14 then SD=__________
- IF t0=6,tm=12 and tp=18 then Vt=_______
- The graphical method for solving a linear programming problem is applicable when
Two variables are involved
Three variables are involved Any number of variables are involved
12. Which of the following is equivalent relation to the constraint x=2 of a linear programming problem? X≥2 x≤2 x<2 and x≥2
x<2 and X>2
- While using simplex method for a LPP if there are 4 standard equations in 8 variables then number of non basic variables will be _______
14. X1 X2 R1 R2
Q15. In the purchasing model without any shortage(Wilsonsmodel) which of the following quatitiy does not vary?
Supply
Demand
Inventory Transportation cost
- How many decision variables are involved in the inventory model with shortages? One
Two Three Four
Q17. Which of the following rule is used in order to minimize the decision variables in any inventory model?
Derivative test Simplex method PERT Graphical method 18. R→0 R=D R>D or R<D R→∞
- ABC analysis depends on the
Quality of materials Cost of materials
Related MTH601 files
All MTH601 files →- MTH601 Midterm Past Paper Spring 2009 Midterm PDF 153 KB
- MTH601 Midterm Past Paper Spring 2009 (Word) Midterm DOC 112 KB
- MTH601 Midterm MCQs 2020 Midterm DOCX 827 KB
- MTH601 Midterm Past Paper 2006 Set 2 Midterm PDF 147 KB
- MTH601 Handouts Lectures 1-45 Handout PDF 1.1 MB
- MTH601 Quiz Solution by Aziz Raaj Quiz PDF 106 KB
Get more out of VUBuddy, for free
- Unlimited downloads
- The explanation behind every MCQ answer
- Study offline on slow data
- 30 downloads a day instead of 3
- Sign in and buy Pro Semester here
One Pro Semester membership works in both the extension and the app.