1- Which of the following correspond to the practical limitation of available resource while modeling a real life situation into a linear program?
- Constraints
- Objective function
- Linear function
- Decision variables
2- Which of the following method follows iterative procedure to solve a linear programming problem?
- Graphical
- Algebraic(Simplex)
3Solution region of the constraints :2x+3y>12 and 2x+3y<12 will be the_____.
- Point(6,4)
- Straight line:2x+3y-12
- Empty set
- All first quadrant
4In the graph of the purchasing model with shortages the area under the horizontal axis represents________.
- Set up cost of item
- Purchase cost of item
- Carrying cost of item
- Shortage cost of item
5The straight line associated with the constraints 2x+3y<12 will meet xaxis at a distance of______ units from origin.
- 2
- 4
- 6
- 3
6Which of the following value is correct for the expected time of an activity having optimistic, pessimistic and most likely times as 4,8 and 6 days.
- 666 days
- 466 days
- 6 days (not sure)
- 933 days
7- In a network flow a diagram for an activity(I,j) of duration of three days if its earliest start time is of two days then which of the following will be its early finish time?
- One and half day
- One day
- Six days
- Five days (not sure)
8- In a development project. If an activity (m,n) of seven days duration starts late on 5rd day then which of the following will be its latest finish time?
- 7th day
- 5th or 7th day
- 12th day
- 5th day
9- Which of the following is an intermediate step to model a linear programming problem?
- Identify the objective function.
- Identify the non-negative restrictions and constraints
- Identify the unknown decision variables
- None of these
10A/An ________ is the collection of inter related activities to be performed in a particular sequence to completion.
- Project
- Branch
- Event
- Node
11- Which of the following times are directly to the activity cost that is by reducing the activity duration the direct cost of the corresponding activity is increased?
- PERT Times
- CPM Times
12- Which of the following is an operation research (OR) process?
- Linear programming
- Networking
13In the purchasing Model with shortages the cost function C(S,Q) can also be expressed as function of_______.
- (S,D)
- (Q,D)
- (S.t)
- (t,D)
Related MTH601 files
All MTH601 files →- MTH601 Midterm Formulas by Aman Midterm PDF 21 MB
- MTH601 Midterm Past Paper 2004 Midterm PDF 39 KB
- MTH601 Midterm Solved MCQs Set 2 by Junaid Midterm PDF 1.5 MB
- MTH601 Midterm Solved MCQs by Junaid Midterm PDF 1.6 MB
- MTH601 Handouts by VUBuddy Handout PDF 5.6 MB
- MTH601 Quiz 1 2022 by Qa Quiz PDF 5.1 MB
Get more out of VUBuddy, for free
- Unlimited downloads
- The explanation behind every MCQ answer
- Study offline on slow data
- 30 downloads a day instead of 3
- Sign in and buy Pro Semester here
One Pro Semester membership works in both the extension and the app.