Preview text

Text from pages 1, 2, 3 of 220. Download the file for all 220 pages.

CS605 Quiz 3 Fall 2022 · 1. BAC stands for · Budget at completion….confirm

  1. Instead of going through the entire design in a meeting we narrow down the focus by conducting ________ for each component or small group of

Walkthrough….confirm

  1. Let the value of Task set selector (TSS) for a new project is computed to be less than 1.2 (TSS<1.2) then its degree of rigor will be
  2. Let the value of Task set selector (TSS) for a new project is computed to be less than 1.2 (TSS 1.0 – 3.0) then its degree of rigor will be

Structured…..confirm

  1. Let the value of Task set selector (TSS) for a new project is computed to be less than 1.2 (TSS<2.4) then its degree of rigor will be Strict…..confirm

6. BCWP refers to

Budgeted cost of work performed so far….confirm

  1. The ________ is the amount of surplus time allowed in scheduling tasks so that the network critical path is maintained on schedule.

Total float…..confirm

  1. ___________ reviews the process description for compliance with the organizational policies, standards and other parts of the software project plan

Software Quality Assurance (SQA) group…..confirm

9. If software testing teams defect removal efficiency is 80% then

20% bugs still exist in application…….confirm

10. ________ are sometimes also known as walkthroughs or inspections

Formal technical reviews…..confirm

  1. _______ provides the management with the necessary data to be information about product quality through auditing and reporting functions.

Quality assurance……confirm · 12. Schedule Performance index (SPI) is equal to · SPI = BCWP/BCWS …..confirm · 13. Schedule variance (SV) is equal to · SV = BCWP – BCWS ……confirm

  1. For a project if value of TSS is 0.9 then the degree of rigor for this project will be
  2. The consequences or impact of risk will be ________ when the project will show failure to meet its requirements and hence will result in mission failure.

Catastrophic……confirm

  1. The consequences or impact of risk will be ________ when the project will show would degrade performance to a print where mission success is questionable.

Critical….confirm

  1. The consequences or impact of risk will be ________ when the project will show result in degradation of secondary mission.

Marginal…..confirm

  1. The consequences or impact of risk will be ________ when the project will show inconvenience.

Negligible……confirm

  1. _________ project risks and technical risks are the three main types of risk that are faced by almost every project.
All CS605 files →
CS605 Software EngineeringII All CS605 handouts, past papers, quizzes and MCQs in one place. Open course page

Get more out of VUBuddy, for free

Android app Free on Google Play
  • Unlimited downloads
  • The explanation behind every MCQ answer
  • Study offline on slow data
Get the Android app
Chrome extension Free on the Chrome Web Store
  • 30 downloads a day instead of 3
  • Sign in and buy Pro Semester here
Add to Chrome

One Pro Semester membership works in both the extension and the app.