- Instead of going through the entire design in a meeting we narrow down the focus by conducting ________ for each component or small group of
Walkthrough….confirm
- Let the value of Task set selector (TSS) for a new project is computed to be less than 1.2 (TSS<1.2) then its degree of rigor will be
- Let the value of Task set selector (TSS) for a new project is computed to be less than 1.2 (TSS 1.0 – 3.0) then its degree of rigor will be
Structured…..confirm
- Let the value of Task set selector (TSS) for a new project is computed to be less than 1.2 (TSS<2.4) then its degree of rigor will be Strict…..confirm
6. BCWP refers to
Budgeted cost of work performed so far….confirm
- The ________ is the amount of surplus time allowed in scheduling tasks so that the network critical path is maintained on schedule.
Total float…..confirm
- ___________ reviews the process description for compliance with the organizational policies, standards and other parts of the software project plan
Software Quality Assurance (SQA) group…..confirm
9. If software testing teams defect removal efficiency is 80% then
20% bugs still exist in application…….confirm
10. ________ are sometimes also known as walkthroughs or inspections
Formal technical reviews…..confirm
- _______ provides the management with the necessary data to be information about product quality through auditing and reporting functions.
- For a project if value of TSS is 0.9 then the degree of rigor for this project will be
- The consequences or impact of risk will be ________ when the project will show failure to meet its requirements and hence will result in mission failure.
Catastrophic……confirm
- The consequences or impact of risk will be ________ when the project will show would degrade performance to a print where mission success is questionable.
Critical….confirm
- The consequences or impact of risk will be ________ when the project will show result in degradation of secondary mission.
Marginal…..confirm
- The consequences or impact of risk will be ________ when the project will show inconvenience.
Negligible……confirm
- _________ project risks and technical risks are the three main types of risk that are faced by almost every project.
Related CS605 files
All CS605 files →- CS605 Final Term Quiz 4 July 2023 by Miss Mehwish Quiz PDF 541 KB
- CS605 Final Term Quiz 3 12 July 2023 by Miss Mehwish Quiz PDF 542 KB
- CS605 Final Term Quiz 3 by Wasi Quiz PDF 805 KB
- CS605 Final Term Past Paper Spring 2010 Final term RTF 304 KB
- CS605 Handouts Handout PDF 1.1 MB
- CS605 Midterm Solved MCQs with References Midterm PDF 96 KB
Get more out of VUBuddy, for free
- Unlimited downloads
- The explanation behind every MCQ answer
- Study offline on slow data
- 30 downloads a day instead of 3
- Sign in and buy Pro Semester here
One Pro Semester membership works in both the extension and the app.