_____________ identifies the degree of uncertainty that the product will meet its requirements and be fit for its intended use. A. Cost risks B. Support risks C. Schedule risks
D. Performance risks Page 87
Once the higher management has devised the mitigate strategy, the project must be monitored for this ----------------------. A. Particular Requirement
B. Particular risk ok
C. Particular task D. Particular schedule
_____________ can be uncovered after careful evaluation and analysis whereas ____________ cannot be identified.
A. Predictable risks, Unpredictable risks Page 86
B. Unpredictable risks, Business risks C. Predictable risks, Technical risks D. Unpredictable risks, Predictable risks
If we plot a graph between defects reported, and defects fixed then: A. Difference between defects reported and fixed will show the defects yet to be fixed ok B. This graph will show that the defect detection process is not accurate C. We can not draw any information from that graph D. This graph will show that some requirements are ambiguous
Certain reusable software components were to be developed by a/an ---- ---- having no knowledge of its internal design standards. A. Quality Assurance Team
B. 3rd party ok
C. 2nd party D. In-house Only ----------------------- of the software components scheduled for reuse will, in fact, be ------------- into the application. The remaining functionality will have to be custom developed. A. 90%, integrated B. 80%, excluded C. 100%, integrated
D. 70%, integrated Page 89 ok
___________ is concerned about dealing with the resultant software and ensuring that it will be easy to correct, enhance, and adapt.
A. Support risks ok
B. Cost risks C. Performance risks D. Schedule risks
Formula for the Risk Exposure (RE) is given by _________.
A. RE = Probability of the risk * Cost ok
B. RE = (Probability of the risk + Cost) / 2 C. RE = Probability of the risk / Cost RE = Probability of the risk + Cost
_____________, project risks, and technical risks are the three main types of risks that are faced by almost every project. A. Sales risks B. Semantic risks
C. Business risks ok
D. Global risks
___________ tries to ask and answer questions related to Product size, Business impact, Process definition, Staff size, experience, etc. for each software project. A. Risk Prevention
B. Risk item checklist ok
C. Formal reviews D. Informal reviews The consequences or impact of risk will be _____________ when the project will show Failure to meet its requirements and hence will result in mission failure. A. Marginal B. Critical C. Negligible
D. Catastrophic ok
Risk mitigation involves______________.
A. Reducing the impact of risk ok
B. Reducing the risk management plan C. Redesigning the contingency plan D. Performing the risk analysis again
Several entities are always created -------------- and deleted together then this is a strong indication that they should be grouped into ---------- logical file/files. A. Together, Double
B. Together, Single Page 48
C. Together, Multiple D. All Together, Multiple
Software _____ relates individual software measures to provide a normalized view. A. Plan
B. Metric Page 65 ok
C. Attribute D. Measure
____________ is necessary to learn from the mistakes and for the improvement of the process continuously. A. Risk analysis B. Good decision C. Improvement
Related CS605 files
All CS605 files →- CS605 Official Handouts Official handout PDF 2 MB Free
- CS605 Final Term Subjective by Waqar Siddhu Final term PDF 2.8 MB
- CS605 Assignment 1 Solution Assignment DOCX 32 KB
- CS605 Quiz 3 Solution by Lucky Quiz PDF 585 KB
- CS605 Quiz 1 May 2026 Quiz PDF 60 KB
- CS605 Midterm Quiz by Attiq Kundi Quiz PDF 813 KB
Get more out of VUBuddy, for free
- Unlimited downloads
- The explanation behind every MCQ answer
- Study offline on slow data
- 30 downloads a day instead of 3
- Sign in and buy Pro Semester here
One Pro Semester membership works in both the extension and the app.